单项选择题
The tentative cargo plan().
A.eliminates confusion with the final stowage plan B.shows the approximate amount of cargo to be loaded in each hold C.expedites the total operation D.requires an unproportional number of gang hours of work to discharge the cargo
单项选择题 The terminal staff tallies the cargo mainly before the ship’s().
单项选择题 The total berth time for a vessel can be reduced through a reduction().
单项选择题 The transportation of dangerous cargo in packages is governed by().