单项选择题
The stowage factor should be calculated().
A.before the stowage plan is made B.when the stowage plan is made C.after the stowage plan is made D.before loading
单项选择题 The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().
单项选择题 The tentative cargo plan().
单项选择题 The terminal staff tallies the cargo mainly before the ship’s().